Monday, December 12, 2011

Production Meeting 4 - October 24th, 2011


Today’s meeting was focused mostly on casting and the updates on it. The decision was made that we would no longer have casting during reading week due to conflict of the casting members availability. So we decided on an official date, which will be on November 9, 2011 on the ground floor of the library from 10-7pm, and the room has already been booked. We decided to meet up an hour before the auditions began so that we could be fully prepared. I was instructed to book out a Panasonic camera, tripod, and tape because we wanted to record the audition so that we could burn footage onto the DVD. The studio was booked for November 24th, 25th, and 28th, 2011 for filming. I volunteered to provide my contact information and create a flyer to post around campus. An email was also created specifically for casting which we made during the meeting. The email address was (casting.deadserious@live.co.uk) and the password as (casting2) and this was available for all group members. The technical and rehearsal was scheduled for Thursday, November 24th, 2011 at 11am, to prepare for filming, set built by 12pm, and after lunch actors available on set rehearsal. We said we would send character information to possible actors via email. Everyone was reminded once again to put their contact information on Facebook group page if they haven’t done so yet. To get an idea of an office we watched some YouTube clips of current shows, to see how they designed the layout of and office and so we can hopefully be creative with camera shots as well. We ended the meeting by doing a read through of the current script.

The next meeting was then scheduled for Friday, October 28th, 2011 at 12pm in the Library.

No comments:

Post a Comment