The next meeting was then scheduled for Monday, October 24th, 2011 at 11am in the Library.
Monday, December 12, 2011
Production Meeting 3 - October 21st, 2011
Our third meeting took place on October 21st, 2011 and began at 1pm after our lecture on the ground floor of the library. This was the first meeting that I was able to attend. I formally introduced myself to the rest of my group members. We all agreed that a schedule needed to written up before filming begins. Mary, Louise, Tamara and myself put our names forward to be apart of the casting team. We discussed that we must use local actors and film when we hold the auditions. All group members at this time were required to have a pre-production role as well as a production role. This way, all group members will be gaining experience in different areas of TV Drama production. Everyone was assigned to a role. I worked on the Casting Team, for production I requested to work on camera and audio. After we sorted our production roles we then organized the schedule for it and the rehearsal shoot. Each group member was instructed to put his or her contact information on the “TV Drama Group 2” Facebook group page. Whoever is working on over subscribed production roles also had to help out other production roles when needed? We discussed the props that we needed for the set such as a desk from an unused classroom, leather chair and sofa from the hub. After we went over the props we finalized the production roles and wrote it in the production folder. Someone suggested that we should have auditions and completed casting during reading week but not every member would be available. The meeting was then adjourned and decided our next meeting date. The following meeting after that is scheduled for Friday, October 28th, 2011, which a room has already been booked for this.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment